SiopNEWydd Planning Application and Building Design

The Proposed Scheme

We are pleased to present here a series of plans and computer-generated images (CGI’s) for the SiopNEWydd design approved by the shop directors in May.  


This will be submitted for planning approval to Carmarthen County Council (CCC) around late July.  Necessary information such as access and design statement plus key professional reports are being prepared by our architect meantime.  All these documents will eventually be available for public scrutiny on the CCC planning portal.

Overall Two-phase Scheme

As shown below the design is for a development in two phases. Initially phase 1 provides a new shop and post office with a small tea station facility and outdoor covered area.  Phase 2 would extend into this, incorporating a cafe with indoor seating and tables whenever we are ready to do so. 


The directors have adopted this prudent approach for several reasons.  Firstly to ensure our volunteer numbers and business is sufficiently successful and robust running the new shop before adding responsibility for a new cafe enterprise.  Our track record of running the shop and post office is strong, but we can’t yet demonstrate the same for a café.  Especially given current economic circumstances we believe funders would be wary of us doing too much at once, but positive about a cautious approach.  


A planning application for the combination of both phases demonstrates our future intentions, proves our sensible approach, and secures permission for the whole without needing any further planning permission.


Our community consultation clearly showed the shop and post office as highest priorities, with a cafe as highly desirable.  This design seeks therefore to secure the community’s ambitions.

The Design Rationale

The scheme is the culmination of much work by everyone. It reflects our wide community consultation run by Ways of Working and developed by our selected architect Huw Griffiths Associates (HGA) working closely with the project team and directors.

Designing the building involved taking careful account of many factors. The process involved HGA, the project team and directors as well as presentations, further consultation and feedback from the community. It also drew on professional advice including hydrology, mechanical and structural engineering, quantity surveyor (costing), ecology, planning, highways, and considerations of potential funding. This has demanded intense work and debate, significant adjustment, refinement, and compromise. Thanks to all for their contributions.


Overall, this final scheme:


Presented here is the two-phase design scheme the directors have agreed to put forward as our planning application. The whole scheme is designed to secure permission for phases 1 and 2 together, each to be built consecutively. 

Initially Phase 1 build would replace the shop and Post Office incorporating a small tea point. Phase 2 extends to provide a café. This way we can match progress with our resources establishing and securing each stage of the business effectively.

Site Location and Plan

HG.21.08-20.001-V9 Site Location.pdf

Site Location

HG.21.08-20.003-V9 Proposed Site Plan.pdf

Overall Proposed Site Plan

Note: To enlarge the image, click on the arrow at the top right of each image to open it in a new window.

Full Planning Application

This shows the full extent and ambition of the scheme overall.  It includes the shop, Post Office, cafe, and seating area.


Presented here are a selection of design drawings including the site plan, internal floor layouts, floor area comparisons, building elevations, and a number of computer graphic simulated (CGI) views.


NOTE:  the CGI views are indicative only and inevitably look very artificial.  No decisions have yet been made on the inside or outside styles, types of finishes, colours, or details of fittings and fixtures.  There will be plenty of opportunity for further community consultation, input, and debate on those aspects.  Likewise, the details of planting schemes or type of surfaces outside the building.


Note: To enlarge the image, click on the arrow at the top right of each image to open it in a new window.

HG.21.08-21.001-V9 3D View External, Full Planning Application and Phase 1 Build.pdf

Overall Proposed Site Plan - (letters refer to external CGI pictures below)

HG.21.08-21.002-V9 3D View Internal, Full Planning Application, with Coffee Shop.pdf

Internal, Full Planning Application, with Coffee Shop. Note the viewpoints shown as letters and their direction correspond with the internal CGI images

HG.21.08-20.004-V9 Proposed Ground Floor, Full Planning Application, with Coffee Shop.pdf

Ground Floor, Full Planning Application, with Coffee Shop

HG.21.08-20.006-V9 Proposed Elevations, Full Planning Application, with Coffee Shop.pdf

Elevations, Full Planning Application, with Coffee Shop

HG.21.08-21.004-V9 3D Renders External A & B, Full Planning Application, with Coffee Shop.pdf

External A & B, Full Planning Application, with Coffee Shop

HG.21.08-21.005-V9 3D Renders External C & D, Full Planning Application, with Coffee Shop.pdf

External C & D, Full Planning Application, with Coffee Shop

HG.21.08-21.006-V9 3D Renders External E & F, Full Planning Application, with Coffee Shop.pdf

External E & F, Full Planning Application, with Coffee Shop

HG.21.08-21.010-V9 3D Renders Internal A & B, Full Planning Application, with Coffee Shop.pdf

Internal A & B, Full Planning Application, with Coffee Shop

HG.21.08-21.011-V9 3D Renders Internal C & D, Full Planning Application, with Coffee Shop.pdf

Internal C & D, Full Planning Application, with Coffee Shop

HG.21.08-21.012-V9 3D Renders Internal E & F, Full Planning Application, with Coffee Shop.pdf

Internal E & F, Full Planning Application, with Coffee Shop

Phase 1 Build with Tea Station

The main focus of this is the shop and Post Office and is designed to ensure sustainability in construction and running costs.   It includes a small tea station facility and has a large covered outside area for events and activities as well as future expansion and development.


Presented here are a selection of design drawings including the site plan, internal floor layouts, floor area comparisons, building elevations, and a number of computer graphic simulated (CGI) views


NOTE:  the CGI views are indicative only and inevitably look very artificial.  No decisions have yet been made on the inside or outside styles, types of finishes, colours, or details of fittings and fixtures.  There will be plenty of opportunity for further community consultation, input, and debate on those aspects.  Likewise, the details of planting schemes or type of surfaces outside the building.


Note: To enlarge the image, click on the arrow at the top right of each image to open it in a new window.

Note: To enlarge the image, click on the arrow at the top right of each image to open it in a new window.

HG.21.08-21.003-V9 3D View Internal, Phase 1 Build, with Tea Station.pdf

Internal - Phase 1 Build, with Tea Station

HG.21.08-20.005-V9 Proposed Ground Floor, Phase 1 Build, with Tea Station.pdf

Proposed Ground Floor, Phase 1 Build, with Tea Station

HG.21.08-20.007-V9 Proposed Elevations, Phase 1 Build, with Tea Station.pdf

Proposed Elevations, Phase 1 Build, with Tea Station

HG.21.08-21.007-V9 3D Renders External A & B, Phase 1 Build, with Tea Station.pdf

External A & B, Phase 1 Build, with Tea Station

HG.21.08-21.009-V9 3D Renders External E & F, Phase 1 Build, with Tea Station.pdf

External E & F, Phase 1 Build, with Tea Station

HG.21.08-21.008-V9 3D Renders External C & D, Phase 1 Build, with Tea Station.pdf

External C & D, Phase 1 Build, with Tea Station

HG.21.08-21.013-V9 3D Renders Internal A & B, Phase 1 Build, with Tea Station.pdf

Internal A & B, Phase 1 Build, with Tea Station

HG.21.08-21.014-V9 3D Renders Internal C & D, Phase 1 Build, with Tea Station.pdf

Internal C & D, Phase 1 Build, with Tea Station

HG.21.08-21.015-V9 3D Renders Internal E & F, Phase 1 Build, with Tea Station.pdf

Internal E & F, Phase 1 Build, with Tea Station

Comparison

Here are the plans and schedule of areas side by side for ease of comparison.  This shows how the full planning application with coffee shop compares to the phase 1 build with tea shop.

HG.21.08-20.008-V9 Schedule of Accommodation.pdf

Phase 1 and 2 Schedule of Accommodation